Overhead supplies
Many country homes and farm buildings are fed by overhead lines on poles. The supply, the cut-out and the route of the cable into the building have to be checked, and any change is agreed with the network operator.
Tell us about the job and your postcode. It takes a few minutes, it is free and there is no obligation.
A consumer unit to replace, a rewire, a garage or barn that needs a supply, or lighting for a new kitchen: describe the job once and get a free quote from electricians who work across Lincolnshire, in the towns and out in the fens and the wolds.
Enter the load and the length. It shows which sizes of cable pass, and which lose too much voltage over the distance.


In a flat, rural county the supply often arrives on a pole, and the shed or the barn is a long way from the house. Both change how the job is designed.
The second largest county in England, and a flat one. It was a base for the Royal Air Force in the Second World War, which gave it the name Bomber County.
Enter the room and the lamp. It gives the count, the grid and the spacing, and draws the plan.

Pick the job. It says whether it is notifiable in England, and what paperwork to ask the electrician for.

Open country brings jobs that a town house does not have. Tell the electrician about the supply when you ask for a quote.
Many country homes and farm buildings are fed by overhead lines on poles. The supply, the cut-out and the route of the cable into the building have to be checked, and any change is agreed with the network operator.
Where there is no earth terminal from the supplier, a rod in the ground is used instead, called a TT system. It relies on RCD protection, and the rod and the RCD should be tested.
A workshop, a barn or a garden room needs a supply cable that suits the run, the ground and the load. Armoured cable is usual when it is buried, and the size depends on the distance.
Pumps, dryers and workshops can need a three-phase supply and careful sizing, and some jobs call for a survey of the whole installation first.
Grouped by council, which is who to ask about listed buildings and conservation areas. Distances are in miles, in a straight line from the centre of Lincoln.
37 towns and villages across the county are listed on this page, from Lincoln, Gainsborough and Sleaford to Boston, Louth, Skegness and Grimsby. Put your postcode in the form to check that you are covered.
It depends on the load and the distance, and a long run needs a thicker cable to avoid losing voltage. The cable tool on this page shows the sizes that pass for a given load and length, and the electrician will confirm the final design.
In England, work that adds a new circuit or replaces a consumer unit has to be notified to building control, which a registered electrician does for you. Smaller jobs may need a minor works certificate. The tool on this page gives a first answer.
It depends on the size of the room and how bright you want it. The lighting tool on this page gives a count and a layout to start from, and the spacing should avoid dark corners.
It is the box that holds the fuses or breakers. An old one without RCD protection is worth replacing, and a replacement is notifiable work. An inspection can tell you whether yours is due.
Often. Overhead supplies and earthing by a rod are more common, and outbuildings can be a long way from the house. Tell the electrician about the supply when you ask for a quote.
Yes, with the right supply and a suitable circuit. It is notifiable work, and the existing supply has to be checked first. Say in the form that you want a charging point and where the car will be parked.
The work you want, where in the property it is, the age of the wiring if you know it, and any photos of the consumer unit. A clear description helps to give a firm price.
A question before you ask for a quote? Write to us and we will reply by email.
Describe the job and get a free quote, with no obligation.
Get my free quote